1. Set up the receiving work

Create a delivery board with a review phase.

  1. 01

    Create the internal board

    In Projects, open the board selector and choose + New board. Name this example Small onboarding. Leave established boards unchanged.

  2. 02

    Use a short sequence of phases

    For this example, use Review scope, Plan kickoff, Delivery and Close out. These names are proposed team choices, not Pipedrive defaults. Keep a project in Review scope while a material question remains.

  3. 03

    Create or link the project from the deal

    Inspect the deal’s Projects panel for an existing link first. Pipedrive documents a Mark as won and create a project option at close and a sidebar route to create or link a project. Use the appropriate route for the current deal state; do not change a real win date or create another project just to repeat the example.

  4. 04

    Check the link and receiving owner

    Name the example D-418 / Cedar Demo onboarding. Verify the deal reference and choose Alex as project owner. Open the linked deal from the project before adding work. Confirm the scope reference is accessible under Alex’s permissions.

2. Build a small template

Start with the work that repeats.

  1. 01

    Create a template on the board

    Go to Projects > Templates and choose + Template. Select Small onboarding and give the template a name that distinguishes it from a customer project.

  2. 02

    Add the review and planning work

    Use the proposed work below as a starting point. Keep customer-specific promises out of the reusable text. Name the person who will check each item when the template is used.

  3. 03

    Set and inspect relative due dates

    Templates can schedule work relative to a start date. Choose offsets that reflect your coverage, then inspect the actual generated dates on the fictional project. An internal review deadline must not silently become a customer kickoff promise.

  4. 04

    Save, then apply once to the test project

    Use the template’s save control. For an existing project on the same board, open its menu and choose Use template. Inspect existing work first and record the start date used for the added plan.

Four work items for this fictional onboarding.

Review scope / Alex

Open the agreed scope reference and check the two-session limit. Record acceptance or a specific question before planning the customer kickoff.

Resolve access approver / Maya

Name who at Cedar Demo can approve system access. If the name is unknown, leave the question visible and agree the next internal check.

Arrange kickoff / Alex

After the review, agree the customer date and participants. Do not treat the template’s provisional schedule as an invitation already sent.

Prepare the two sessions / Alex

Plan the agreed work from the scope. A new request for migration goes back for a commercial decision; it is not silently added to this onboarding.

3. Walk D-418 through review

Keep the access question with the project.

  1. 01

    Maya submits the linked scope

    The deal is won and the project is in Review scope. Maya points Alex to the agreed two-session scope. No kickoff date has been promised.

  2. 02

    Alex records the gap

    Alex leaves a project note: Access approver is missing; Maya to confirm before kickoff planning. The receiving review stays open. Completing the project-creation action does not complete this review.

  3. 03

    Maya supplies the answer

    Maya adds the approved contact reference and tells Alex where it is recorded. They keep the original question and the response in the same project.

  4. 04

    Alex accepts the reviewed scope

    Alex checks the reference, records acceptance with the scope version and date, completes the review work and moves the project to Plan kickoff. Delivery is still ahead. A later material scope change gets another review.

Try these cases before using customer records.

These are proposed checks, not completed Pipedrive test results. Use the permissions of the people who will do the work.

The deal already has a project

Find the intended project and inspect its work. Do not create a second transfer merely because the deal is opened again.

A reviewer cannot edit or open the scope

Record the access problem. An administrator reviews the appropriate access; the reviewer does not accept unseen commitments.

The project already has tasks

Apply the template only after checking what exists. Verify the resulting item count and dates, including the unchanged project start date.

The access approver is unknown

Keep the review open with a next-action owner and internal deadline. Check that nobody mistakes the phase for enforced approval.